Effluent Treatment Plant (ETP)
Industrial effluent treated through proven process trains for safe discharge and reuse.
Every 3R practice is designed, manufactured, improved and consulted in-house. One accountable team from drawing to daily operation in Pune, Mumbai & Maharashtra.
19+
Years turnkey
01–07
Design → O&M
5 KLD+
To 0.5 MLD
4
Verticals
ETP · STP · WTP
End-to-end engineering of effluent, sewage and water treatment plants — configured around the treatment technology your site actually needs.

Water & waste water — engineered to reuse, not just discharge
Industrial effluent treated through proven process trains for safe discharge and reuse.
Domestic sewage recovered into water fit for flushing, gardening and cooling towers.
Raw water polished to process, potable and boiler-feed standards.
Compost · Biogas · Pellets
Municipal solid waste, organic industrial waste and kitchen waste converted into compost, fuel and energy using the right decomposition technique.

Solid waste — compost, biogas & fuel
Rapid, mechanised aerobic composting for bulk organic waste.
Anaerobic decomposition that turns wet waste into clean cooking fuel & energy.
Slow, natural conversion of organic matter into rich bio-fertiliser.
Green biomass densified into high-efficiency fuel pellets.
MPCB · CPCB · MoEF
Complete statutory guidance for projects — reports and clearances prepared exactly as per MPCB, CPCB and MoEF, New Delhi norms.

Statutory clearance — without the chase
Full assessment studies and report preparation for clearance.
End-to-end liaison and documentation for project clearance.
Annual statements, audits and compliance submissions.
Site-specific management plans for varied project types.
Environmental monitoring with laboratory-grade analysis.
STP · ETP · OWC
Dedicated annual O&M contracts that keep plants compliant, efficient and audit-ready — run by a trained technical team.

O&M — plants that stay compliant, daily
Round-the-clock operation of sewage treatment plants.
Trained operators for effluent treatment plants.
Organic waste converters kept running at full efficiency.
Seven steps — single team, zero hand-off risk.
Process engineering & load study
Civil, MEP & P&ID drawings
Manufacture & procurement
On-site installation
Hydraulic & process trials
Handover at design output
Annual operation contracts